EPC · ENGINEERING · O&M sales@globalpowerdesigner.com

A power plant contractor, not a trading company

We engineer, manufacture, build and maintain power plants. The company has been doing this since 1996, and the scope has not changed: take responsibility for a plant that works.

Founded1996
Rangeup to 300 MW
ScopeEPC, complete equipment sets, plant relocation, O&M

What we actually do

We are an engineering contractor in the power sector. Our work covers thermal, gas-fired, biomass and waste-to-energy projects up to 300 MW, delivered as EPC turnkey, as equipment packages with technical supervision, as plant relocation, or as long-term O&M.

That combination matters more than it sounds. A company that only sells equipment has no interest in whether the plant reaches its guaranteed output two years later. A company that also operates plants does — because we are often the ones called back when something does not perform.

How we work

Three principles have not changed in nearly thirty years. Characterise the fuel before designing the plant. Write the scope boundary down before signing. Keep the commissioning engineers who built it available after handover.

We are based in Jinan, Shandong, with manufacturing and assembly facilities and a project team that travels. Our regional work is concentrated in South and Southeast Asia, where we have delivered into India, Indonesia, Malaysia, Thailand and Singapore.

What we are not

We are not a trading company reselling other people's equipment, and we do not bid on projects where the fuel or the grid connection makes the economics unworkable. If your project does not stand up, we will say so — early, and with the numbers.

Company facts

1996
Established
[XX]
Staff

Registered address

[FULL LEGAL COMPANY NAME Co., Ltd.]
[Building / Street], [District]
Jinan, Shandong, China

Markets with delivered projects

India, Indonesia, Malaysia, Thailand, Singapore

Certification

Quality and compliance

Scanned certificates are available on request and are provided with every tender submission.

All certifications

ISO 9001

Quality management system

[Certificate No.]

ISO 14001

Environmental management system

[Certificate No.]

ISO 45001

Occupational health and safety

[Certificate No.]

CE marking

EU conformity for exported equipment

[Scope]

SGS / BV inspection

Third-party factory acceptance testing

On request

Need our company profile for a tender?

We will send the company profile, certification pack and reference list in the format your tender requires.

WhatsApp us