Power Plant Equipment Supply with Technical Supervision
For owners who have a local contractor but need the core equipment right.
Many of our clients already have a civil contractor or a local EPC partner. What they lack is the core equipment package and the technical authority to specify it correctly. This is the fastest route to a working plant for clients who want to keep construction local.
We supply the equipment, provide the drawings the local contractor needs, supervise installation and carry out the commissioning. Responsibility for the equipment performance stays with us.
Typical for
- Owners committing capital to a new plant
- Developers needing a firm technical basis
- Local contractors without in-house power expertise
- Industrial groups replacing unreliable grid supply
What the package contains
- Boiler island — Biomass, coal, HFO and waste heat boilers with fuel feeding and ash handling.
- Steam turbine generator — Condensing, extraction and back-pressure units up to 100 MW.
- Gas engine generator sets — 0.5–10 MW units, single or multi-unit parallel configuration.
- Balance of plant — Water treatment, cooling, compressed air, electrical and control systems.
- Spare parts — Two-year operational spares and consumables with defined lead times.
Frequently asked questions
Answers to the questions we are asked most often on this subject. If yours is not here, ask us directly.
Can you supply equipment only, without installation?
Yes. We supply FOB or CIF with full documentation, then provide remote or on-site supervision as a separate line item. Installation is carried out by your contractor under our technical direction.
Who is responsible if the equipment underperforms?
We are, provided installation and operation follow our instructions and the fuel matches the agreed specification. That is why the technical supervision is not optional in our offer — it is how the performance guarantee stays valid.
What inspection and documentation do you provide?
Factory acceptance testing with third-party witness (SGS, BV or TÜV on request), material certificates, welding and NDT records, and a full as-built documentation package in English.
Often combined with
EPC Turnkey Delivery
One contract, one schedule, one point of responsibility from feasibility to commercial operation.
Read more →Operation & Maintenance
A plant that runs 8,400 hours a year is worth more than a plant that runs 7,000 — availability is the cheapest megawatt you will ever buy.
Read more →Tell us what you need to build.
Send us the fuel type, target capacity and site country. We will reply with a preliminary configuration, an indicative budget range and the questions we still need answered.