Waste-to-Energy Plant EPC — Municipal and Industrial Waste

Waste-to-energy solves two problems at once — it disposes of waste and generates dispatchable power from it.

Capacity3 – 50 MW
ScopeEPC turnkey or equipment package
BasisFuel-first design

Waste-to-energy projects live or die on waste characterisation. Calorific value, moisture, inert content and seasonal variation determine whether the plant can hold steam flow without supplementary fuel — and whether the economics survive contact with reality.

We design for the waste that will actually arrive, including the first year when waste composition is often wetter and lower in calorific value than the design case. Flue gas treatment is sized for the local emission standard from the outset, because retrofitting it later is prohibitively expensive.

Where this plant type fits

  • Municipal solid waste — City-scale plants from 200 to 1,000 tonnes per day with grid export.
  • Industrial and commercial waste — Factories and industrial parks disposing of process residue on site.
  • Refuse-derived fuel — RDF production and combustion for cement kilns and power plants.
  • Medical and hazardous waste — Smaller rotary kiln plants with full flue gas cleaning.

Quick facts

3 – 50 MW
Capacity range

Typical project duration and full scope detail are set out below. For a specific site, ask us for a preliminary configuration.

Request a quote
Specification

Typical technical range

Values below are the range we design within. The final specification follows the fuel analysis and site conditions.

Typical technical specification
ParameterRange / Description
Capacity range3 – 50 MW (200 – 1,000 t/day)
CombustionMoving grate or circulating fluidised bed
Waste LHV design range6 – 12 MJ/kg
Flue gas treatmentSemi-dry scrubber, activated carbon injection, bag filter; SCR optional
Emission standardDesigned to EU 2010/75/EU or local equivalent
Bottom ashRecovery of ferrous and non-ferrous metals; ash disposal plan required
Typical construction period20 – 32 months
Scope boundary

What is in and what is out

An explicit boundary is the difference between a quotation and a contract. This is the standard split for a waste-to-energy plants project.

Included in our scope
  • Waste characterisation and mass-burn study
  • Plant design including waste bunker and feeding
  • Boiler, turbine and generator supply
  • Complete flue gas treatment system
  • Residue handling and metal recovery
  • Erection, commissioning and emission performance test
Not included (owner side)
  • Waste collection, transport and gate-fee arrangements
  • Landfill for residues
  • Environmental permitting and public consultation
  • District heating network
FAQ

Frequently asked questions

Answers to the questions we are asked most often on this subject. If yours is not here, ask us directly.

What waste calorific value do you need?

Do not go below 6 MJ/kg as an annual average — below that, the plant will need continuous supplementary fuel and the business case collapses. We insist on a twelve-month sampling programme rather than a single-week analysis.

How do you meet emission standards?

Semi-dry scrubbing with lime, activated carbon injection for dioxins and heavy metals, and a bag filter is the baseline configuration. Where local standards require it, we add SCR for NOx. The treatment train is sized for the guaranteed emission limit, not the typical value.

What happens to the ash?

Bottom ash is roughly 20–25% of input mass by weight. Ferrous and non-ferrous metals are recovered and the remainder is typically landfilled or used as aggregate where permitted. Ash disposal must be arranged before financial close — it is a common cause of delay.