Request a quote
Four fields and a short description is enough to start. You will get a preliminary configuration, an indicative budget range and the list of questions we still need answered — not a generic brochure.
What happens after you send it
- Within one business day — an engineer replies with clarifying questions, or confirms we have enough to proceed.
- Within three to five days — a preliminary configuration: capacity, fuel envelope, scope outline and an indicative capital cost range.
- If the project looks viable — a site and fuel assessment, then a firm technical and commercial proposal.
- If it does not — we tell you why, with the numbers, rather than quoting anyway.
What helps most
- Site country and whether the site is grid-connected or islanded
- Fuel type and availability — tonnage per year or gas supply basis
- Target capacity in MW, and whether steam is also needed
- Whether you already have a local contractor for civil works
- Any commissioning date you have committed to
Procurement or tender enquiry?
Attach the specification by email to sales@globalpowerdesigner.com and mention the tender reference in the form. We respond to formal tenders in the required format.