Certifications and quality control
The certificates that matter to a buyer are the ones that are current, in scope, and issued to the contracting entity. Ours are available as scanned originals on request.
| Certificate | Scope | Reference |
|---|---|---|
| ISO 9001 | Quality management system | [Certificate No.] |
| ISO 14001 | Environmental management system | [Certificate No.] |
| ISO 45001 | Occupational health and safety | [Certificate No.] |
| CE marking | EU conformity for exported equipment | [Scope] |
| SGS / BV inspection | Third-party factory acceptance testing | On request |
Inspection and testing
Factory acceptance testing is carried out before shipment, with third-party witness by SGS, Bureau Veritas or TÜV where the contract requires it. Documentation includes material certificates, welding and NDT records, test reports and as-built drawings in English.
What we will not do
We do not present expired certificates, and we do not claim certifications held by group companies or suppliers. If a certificate is not held by the contracting entity, we say so and propose the alternative.
Need the certificate pack for a tender?
Send us the tender reference and the required document list. We will return the pack in the requested format.