Captive Power Plant EPC for Factories and Industrial Parks

When grid supply is unreliable or too expensive, a captive plant turns a cost centre into a controlled operating cost.

Capacity2 – 60 MW
ScopeEPC turnkey or equipment package
BasisFuel-first design

A captive plant is not a small utility plant — it is a process utility. The load profile follows the factory, not the grid, and downtime is measured in lost production rather than lost revenue. That changes the design priorities: redundancy, fuel flexibility and maintainability matter more than headline efficiency.

We have built captive plants for continuous-process industries where steam and power demand move together. In most cases the right answer is cogeneration — extracting steam for the process and power from the same fuel — and the economics only work if the steam-to-power ratio is measured properly at the start.

Where this plant type fits

  • Cement and lime — Waste heat recovery from kiln exhaust plus supplementary firing for 5–25 MW.
  • Textile and dyeing — Gas or biomass cogeneration supplying steam and power to continuous process lines.
  • Food and beverage — Bagasse, husk or gas fired CHP with steam for evaporation and sterilisation.
  • Paper and packaging — Black liquor or biomass boilers with extraction-condensing turbines.
  • Industrial parks — Central utility plant selling steam and power to multiple tenants.
  • Mining and mineral processing — Heavy fuel oil or gas plants in remote locations, designed for high ambient temperature and dust.

Quick facts

2 – 60 MW
Capacity range

Typical project duration and full scope detail are set out below. For a specific site, ask us for a preliminary configuration.

Request a quote
Specification

Typical technical range

Values below are the range we design within. The final specification follows the fuel analysis and site conditions.

Typical technical specification
ParameterRange / Description
Capacity range2 – 60 MW electrical, with process steam as required
Fuel optionsNatural gas, biomass, HFO, diesel, waste heat, or dual fuel
ConfigurationCogeneration, trigeneration, or power-only with islanding capability
Grid interactionParallel with grid, island mode, or seamless transfer between the two
RedundancyN+1 on critical auxiliaries; black-start capability optional
CoolingAir-cooled condensers common in water-scarce industrial sites
Typical construction period10 – 20 months
Scope boundary

What is in and what is out

An explicit boundary is the difference between a quotation and a contract. This is the standard split for a captive & industrial power plants project.

Included in our scope
  • Load and steam demand profiling
  • Technical and economic option study (fuel, size, configuration)
  • Full plant design and equipment supply
  • Grid interconnection and islanding protection
  • Erection, commissioning and load testing
  • Operator training with plant-specific procedures
  • Optional O&M and spare-parts agreement
Not included (owner side)
  • Factory process modifications downstream of the plant boundary
  • Fuel supply and long-term logistics
  • Utility interconnection agreements and permits
  • Substation works owned by the utility
FAQ

Frequently asked questions

Answers to the questions we are asked most often on this subject. If yours is not here, ask us directly.

Will a captive plant be cheaper than grid electricity?

It depends almost entirely on your fuel cost and your current tariff. As a rule of thumb, a gas or biomass captive plant becomes attractive when the delivered fuel cost is below roughly 60% of the equivalent grid cost per kWh, and when your load factor is above 60%. We run the comparison with your actual twelve-month bill data.

Can the plant run in parallel with the grid and export surplus?

Yes. Parallel operation with export is standard where local regulation allows it. We design the protection and metering for both parallel and island modes, with seamless transfer if the grid fails.

How much space does it need?

A 10 MW gas engine plant typically needs 1,500–2,500 m² including the gas station and switchyard. A biomass plant of the same output needs considerably more, mainly for fuel storage — 4,000–8,000 m².

What happens if the plant trips?

The design basis is that a single generating unit trip must not stop the factory. We size the configuration so that N+1 redundancy covers the critical load, and we set up automatic load shedding for non-critical circuits.

Tell us what you need to build.

Send us the fuel type, target capacity and site country. We will reply with a preliminary configuration, an indicative budget range and the questions we still need answered.