EPC · ENGINEERING · O&M sales@globalpowerdesigner.com

Power plant solutions by fuel and technology

Seven routes to firm power. Each page covers the fuel envelope, the specification range, the scope boundary and the questions buyers ask before committing capital.

Biomass Power Plants

We build biomass power plants that run on the fuel you already have — palm oil residue, rice husk, sugarcane bagasse, wood chips or mixed agricultural waste.

5 – 100 MW
View solution →

Gas Engine Power Plants

Fast, modular and highly efficient: gas engine plants are usually the quickest route from a gas source to reliable electricity.

1 – 100 MW
View solution →

Captive & Industrial Power Plants

When grid supply is unreliable or too expensive, a captive plant turns a cost centre into a controlled operating cost.

2 – 60 MW
View solution →

Combined Cycle Power Plants

Combined cycle is how you convert gas into the most electricity per unit of fuel at utility scale.

50 – 300 MW
View solution →

Waste-to-Energy Plants

Waste-to-energy solves two problems at once — it disposes of waste and generates dispatchable power from it.

3 – 50 MW
View solution →

HFO & Diesel Power Plants

Where gas is not available and the grid will not reach, liquid fuel still delivers the most reliable megawatt per dollar of capital.

1 – 100 MW
View solution →

Coal & Thermal Power Plants

Circulating fluidised bed technology for local coals, low-grade fuels and applications where fuel flexibility matters more than headline efficiency.

25 – 300 MW
View solution →

Not sure which route fits?

Send the fuel type, target capacity and site country. We will tell you which configuration is realistic — and if the project does not stand up, we will say so.

Ask an engineer →
Not sure which route fits your site? Send us the fuel type, the target capacity and the site country. We will come back with a preliminary configuration and an indicative budget range, or tell you plainly if the project does not stand up.

Tell us what you need to build.

Send us the fuel type, target capacity and site country. We will reply with a preliminary configuration, an indicative budget range and the questions we still need answered.

WhatsApp us