EPC · ENGINEERING · O&M sales@globalpowerdesigner.com

Coal-Fired and Thermal Power Plant EPC — 25 MW to 300 MW

Circulating fluidised bed technology for local coals, low-grade fuels and applications where fuel flexibility matters more than headline efficiency.

Capacity25 – 300 MW
ScopeEPC turnkey or equipment package
BasisFuel-first design

Coal-fired capacity is contracting in many markets, but it remains the backbone of base-load supply across South and Southeast Asia, and it is still being built where domestic coal is the cheapest available resource. Our work in this segment is concentrated on industrial captive plants and utility units up to 300 MW.

CFB boilers are our default for local coals with high ash, high sulphur or variable quality, because they tolerate fuel variation that would force a pulverised coal unit into derating. Where emission limits tighten, we integrate SNCR or SCR and electrostatic precipitation from the design stage rather than retrofitting later.

Where this plant type fits

  • Utility base-load units — 25–300 MW units for grids with domestic coal supply.
  • Industrial captive plants — Captive coal or lignite plants for cement, paper, textile clusters and industrial parks.
  • Low-grade fuel utilisation — Lignite, high-ash coal, coal washery rejects and petcoke blends.
  • Repowering and efficiency upgrades — Boiler and turbine replacement on ageing units.

Quick facts

25 – 300 MW
Capacity range

Typical project duration and full scope detail are set out below. For a specific site, ask us for a preliminary configuration.

Request a quote
Specification

Typical technical range

Values below are the range we design within. The final specification follows the fuel analysis and site conditions.

Typical technical specification
ParameterRange / Description
Capacity range25 – 300 MW
Boiler typeCirculating fluidised bed; pulverised coal on request
Steam parameters9.8 – 16.7 MPa, 540 °C, with reheat above 100 MW
Fuel flexibilityLignite, sub-bituminous, high-ash coal, washery rejects, petcoke blend
Emission controlESP, SNCR/SCR, wet or semi-dry FGD as required
CoolingAir-cooled condenser for water-constrained sites
Typical construction period24 – 36 months
Scope boundary

What is in and what is out

An explicit boundary is the difference between a quotation and a contract. This is the standard split for a coal & thermal power plants project.

Included in our scope
  • Fuel analysis and boiler selection study
  • Full plant design and equipment supply
  • Coal handling, crushing and storage
  • Ash handling and disposal system design
  • Emission control systems
  • Erection, commissioning and performance testing
Not included (owner side)
  • Coal mining, transport and supply contracts
  • Transmission line and utility substation
  • Environmental permitting and carbon-related obligations
  • Ash disposal site development
FAQ

Frequently asked questions

Answers to the questions we are asked most often on this subject. If yours is not here, ask us directly.

Why choose CFB rather than pulverised coal?

CFB tolerates wider fuel quality variation, burns lower-grade fuels without derating, and achieves lower NOx formation in the furnace. The trade-offs are slightly lower efficiency at large scale and higher auxiliary power. Below 150 MW with variable fuel, CFB is usually the better choice.

Can the plant meet current emission standards?

Yes, with the right equipment from the start. We design to the local standard, and where that standard is likely to tighten we recommend designing to the stricter figure upfront — retrofitting FGD or SCR into an operating plant costs two to three times more than including it in the original build.

Is coal still viable for new capacity?

In markets with domestic coal and no carbon pricing, yes, particularly for captive industrial plants. Where carbon pricing or financing restrictions apply, we recommend evaluating biomass co-firing or a gas-based alternative in parallel — we will say so directly if the coal option does not stand up financially.

Tell us what you need to build.

Send us the fuel type, target capacity and site country. We will reply with a preliminary configuration, an indicative budget range and the questions we still need answered.